Project Overview
Classification | Phase 1 (Gangnam~Jeongja) | Phase 2 (Jeongja~Gwanggyeo) | Phase 3 (Yongsan~Gangnam) |
---|---|---|---|
Business title | Shinbundang(DX) Line (Gangnam~Jeongja) private investment business |
Extended Shinbundang(DX) Line (Jeongja-Gwanggyo) double track railway private investment business |
Extended Shinbundang(DX) Line (Yongsan-Gangnam) double track railway private investment business |
Contents | Construction and Operation of a double Track Railway connecting city of Gangnam in Seoul and Bundang in Gyeonggi-do |
Construction and operation of a Double Track Railway linking city of Suwon and Yongin, Bundang in Gyeonggi-do |
Construction and Operation of a double Track Railway connecting Yongsan and Gangnam in Seoul |
Overview |
The metropolitan broadband subway transporation network privately invested and planned to provide groundbreaking solution for traffic congestion caused by rapid population growth in southeastern metropolitan area including Pangyo New Town |
The metropolitan broadband subway transporation network privately invested and planned to ensure pulbie transportation to Gwanggyo New Town development district, to provide solution for traffic congestion throughout Seoul from city of Yong-in, Suji and northwestern Suwon in Gyeonggi-do |
The metropolitan broadband subway transporation network privately invested and planned to provide solution for traffic congestion in gangnam, Seoul as well as improve accessibility between Seoul and southeastern metropolitan area |
Methods |
Completed at the same time as the ownership belongs to the state, ensuring operators operation rights * BTO(Build - Transfer - Operate) method |
||
Section & Scale |
· Gangnam Station, Gangnam-gu in Seoul ~ Jeongja Station, Bundang-gu, Seongnam-si in Gyeonggi-do Province · Total Length 18.5km double-track train · Project Cost 1.69 trillion KRW (May, 2002 based on constant prices) |
· Jeongja Station, Bundang-gu, Seongnam-si in Gyeonggi-do Province ~ Gwanggyo station, Yeongtong-gu, Suwon-si in Gyeonggi-do Province · Total Length 12.8km double-track train · Project Cost 1.0255 trillion KRW (May, 2006 based on constant prices) |
· Yongsan Station, Yongsan-gu in Seoul ~ Gangnam Station, Gangnam-gu in Seoul · Total Length 7.795km double-track train · Project Cost 8,722 billion KRW (July, 2007 based on constant prices) |
Period | Operation period: 30 years after completion | ||
Project Participation |
· Competent Authority : Ministry of Land, Infrastructure & Transport · Concessionaire: Shinbundang Railroad Co., Ltd. · Operators: Neo Trans Co., Ltd. |
· Competent Authority: Ministry of Land, Infrastructure & Transport · Concessionaire: Gyeonggi Railroad Co., Ltd. · Operators : Neo Trans Co., Ltd. |
· Competent Authority : Ministry of Land, Infrastructure & Transport · Concessionaire: Newseoul Railroad Co., Ltd. · Operators: Neo Trans Co., Ltd. |
Project Characteristics
-
DX LINE is
a mass transit system which is able to provide fundamental solution to
anticipated traffic southeastern part of the Metropolitan Area and
Pangyo new town construction. -
The Metropolitan Railroad
network construction was led by private investment from planning,
financing, execution to operation. -
Gangnam, Seoul and Bundang/Yongin/Suwon, Gyeonggi
metro system created with cutting-edge technology, which is
connecting Gangnam area of Seoul and Bundang, Yongin & Suwon
aims to carry passengers safely and swiftly. -
It is origin
of intercity metro network connecting places by the shortest distance.
-
Intercity railroad network connection with the Metropolitan Area metro network
Transfer to existing Suin¡¤Bundang Line, Subway Line 2, 3, 7, 9 and Gyeonggang Line.
Connected with other Capital's southwestern lines such as Sinansan Line, Shinbundang(DX) Line extension, etc. -
The most direct route for fast services
Reduction of operation time by maintaining average speed of 47.6km/h, Max. driving speed of 90km/h
Traveling time: 41min 54sec. (based on Gwanggyo-Sinsa train) -
The shortest route for fast services
Connecting Seoul's commercial and business center(Gangnam, Sinsa) with southeastern Metropolitan Area
(Pangyo, Bundang, Yongin, etc)
Expected Effects of DX Line
Time saving(Gwanggyo ~ Sinsa)
Economic Effects
- - Promotion of the first Korean private investment
projects following Shinbundang(DX) Line
Project where line planning, construction
and operation proposal and execution
were made by private sector
- - More added value compared to the existing transportation method
- - Reduction Effect of the number of bus
Metropolitan Area Metro Network
- - Connection to Gangnam area metro network penetrating eastern and western Seoul
- - Establishment of a truly astonishing metropolitan area subway network
Suggest a good model for new town
development
- - Connection Center(Gangnam) and Sub-center(Pangyo, Gwanggyo) in the most effective way
- - A good model for future sub-central city development
Project Overview
Project Name | Private investment for Yongin Light Rail Transit(LRT) |
---|---|
Content | Construction and operation of Yongin LRT based on full-automatic driverless system |
Project Outline |
|
Project Details |
|
Section & Scale |
|
Project Period |
|
Project Characteristics
-
Yongin LRT
operates using full-automatic driverless system and is a
cutting edge transportation means focused on safety,
punctuality and environment -
By promoting balanced development
of Yongin city¡¯s east¡¤west areas,And also by connecting with GSMA
(Great Seoul Metropolitan Area) subway lines, Yongin LRT enables its
passengers to quickly enter places like Seoul and is therefore a future-oriented city rail that would boost potential values of Yongin -
From waterside parks to trails,
Wherever Yongin LRT runs, urban parks, trails, waterscape facilities,
brooks and fountains are installed. LRT runs with nature all together -
Passengers¡¯ safety
Is the utmost priority. Neo Trans is putting its best effort for
the sake of customers¡¯ safety and convenience by
introducing and installing rail trespassing prevention device,
safety fence, silent warning system, and wheelchair spaces
and elevators for the disabled.
Expected Effects of Yongin LRT
Suitable effects for city environment
- Excellent punctuality, safety and eco-friendliness
Middle scale of transport capacity between bus and subway
- Bus: less than 5,000 peopleSubway: less than 30,000~80,000 people
Construction cost reduction
- 50% cut down on cost per km compared to that of subways
Management cost reduction
- Fully automated driverless system(40~50% of personnel required compared to that of ordinary subways)